Thanks Lynx...i've been thinking of your offer and will get back to you.
And for those watching, I'm bringing this manifold project back up to speed! I have ordered more materials and started working on serial #2, Lynx has #1. I'll be documenting this build from start to finish, illustrating the fabrication process so yall will be able to see it take shape.
Raw materials arrived last week
I'm a bit rusty on how these go together, so I started modeling the manifold in Solidworks to get a good feel for it. Here's a screen shot of calculating the collector angles and heights.
At this point, I think I have good dimensions to work with but need tooling to actually make real parts. For the collectors, I wanted something super repeatable and easy to setup and ended up with this design. It's made from scrap angle iron, some threaded rod, and a toggle clamp. The first test cuts were on PVC to double check that the fixture datum simulators were going to work.
Test cuts came out good. The next step was to test the real deal and here are the first cuts on stainless.
That's the progress so far. The next step is to fabricate back purge fixtures and then TIG weld the collector halves together. After that, I can determine what the collector angle needs to be @ the turbine flange and build that portion. And then, runners are modeled and fabricated. And then and then, final welding and finishing. It's gonna be a nice build