More manifold fabrication progress...I'll be porting it tomorrow. So far, I'm digging the Mazworx sr20det/ve flange for 1.25" schedule 10 pipe, the oval to circular transition works well
Runner welding and fitting
Fitting and tacking the last runner...the goal was to match the gaps between runners side to side...came out ok
Here's how I back purge the runners w/ argon. I use this tapered adapter for a wide range of tube and pipe.
3 down, 1 to go
All together now
The head flange was welded last night