Join Date: 2011-11-21 Location: San Dimas, CA Posts: 267 Trader Score: 0 (0%)
Originally Posted by eggman Is there a deadline on this?
I am very interested but need to sell some limbs or organs since christmas just went by...lol
Production will be starting shortly after the new year, so we'll need the deposits in. The remainder won't be due till March though when the kits ship.
Thanks!
0 Likes
Be the first to like this post.
MFactory / YCW Engineering (LSD's, Gears, Flywheels, Clutches, Driveshafts, Axles) - [url]www.teammfactory.com[/url]
YCW Suspension (Mid-Range Coilovers) - [url]www.ycwsuspension.com[/url]
SWIFT Springs Europe (Exclusive Distributor) - [url]www.swiftspringseurope.com[/url]
SWIFT Springs Asia (Exclusive Distributor) - [url]www.swiftspringsasia.com[/url]