Originally Posted by
groundscraper Thank you, you kind stranger... ahahhaah
So any time predictions? 1 month? 2? until final production. Did the tester mentioned it´s plans?
Ha ha no problem. As soon as I get it I'll be installing it. My plans are to-do a week or so of "spirited" DDing, then I have track events in April and May so I can test it ontrack. They are local tracks and tracks that I'm VERY familiar with (as in, driving them for over 6 years), so I can report back pretty quickly the difference between NON-LSD, MFactory's, and a NISMO NON-LSD drop in (which I also have).
Originally Posted by
BenFenner Great choice for a tester. Thanks for helping out Jon.
No problem, the timing works out well too inbetween track events.
Sweet!