Ordered the last couple parts yesterday, a couple are in transit already, and everything will be waiting for me when I get home on the 3rd.
On the 4th I plan to take the head to the machine shop to have resurfaced, cleaned, valve stem seals, springs and retainers installed, drilled for the 1/2" studs.
On the 6th I start working on the car, build the motor, take the new intercooler to have the v-band flanges installed onto it, take the fuel tank to get the sump welded on, and so on.
Leaves me plenty of time during the day while my daughter is at school to get the job done.
I have my dyno appointment weekend of the 19th, as long as that goes well ill try to get as much seat time in at the track to dial it in and as long as that goes well, Cage week of the 21st. While thats getting done ill get my new front bumper painted and ready to go on. All in all its going to be hectic but it will without a doubt get done without having to stress too much.