Thanks Eno...if I cant get r done soon, I'll take you up on your offer.
Making a little more progress...started off by redoing the screamer pipe for stock cross member clearance
http://turbofx...
Thanks Lynx...i've been thinking of your offer and will get back to you.
And for those watching, I'm bringing this manifold project back up to speed! I have ordered more materials and started work...
I only made a single prototype manifold which was sent out for testing to a customer. I never got any feedback...the customers car was in an accident and not able to be used for testing. He is curr...
This project had a years worth of dust on it until a month ago. I'm working on it again and plan to use this setup on my b13...the car is setup for drag and is undergoing a road track build :) I'll...
This project had a years worth of dust on it until a month ago. I'm working on it again and plan to use this setup on my b13...the car is setup for drag and is undergoing a road track build :) I'll...
This project had a years worth of dust on it until a month ago. I'm working on it again and plan to use this setup on my b13...the car is setup for drag and is undergoing a road track build :) I'll...
This project had a years worth of dust on it until a month ago. I'm working on it again and plan to use this setup on my b13...the car is setup for drag and is undergoing a road track build :) I'll...
Sure do! I made a batch of 2 B13 rear sets and 1 GTiR coil-over version rear set when I built DaveMs set. 1 B13 set went to DaveM so I have 1 of the B13 and 1 of the GTiR version ready to go. The o...
Ok sounds good. I have the 2 pc heims with the injected teflon race in the middle in stock. I'll start working on the order.
Some progress on the manifold...it's almost done, just waiting on a 1/2 in. thick head flange to be machined/delivered.
Final runner design
https://sphotos-b.xx.fbcdn.net/hphotos-prn1/1015021_...
Progress from Sunday funday...I finalized position of the double slip fit collector and turbine flange transition. It's starting to look like a real manifold :D
https://fbcdn-sphotos-g-a.akamaih...
And here is some moar! The pics you are about to see and the pics you saw above are the in process pics for a set of G20 (p10) rear lateral links for a fellow -'er.
After final machining on the...
The chromoly tubing is finally in and it's time to gear up for another run of rear control arms/lateral links. I started machining the other parts for the arms/links a couple of weeks ago and thoug...
Some progress on the manifold...it's almost done, just waiting on a 1/2 in. thick head flange to be machined/delivered.
Final runner design
https://sphotos-b.xx.fbcdn.net/hphotos-prn1/1015021_...
Some progress on the manifold...it's almost done, just waiting on a 1/2 in. thick head flange to be machined/delivered.
Final runner design
https://sphotos-b.xx.fbcdn.net/hphotos-prn1/1015021_...
Some progress on the manifold...it's almost done, just waiting on a 1/2 in. thick head flange to be machined/delivered.
Final runner design
https://sphotos-b.xx.fbcdn.net/hphotos-prn1/1015021_...
Some progress on the manifold...it's almost done, just waiting on a 1/2 in. thick head flange to be machined/delivered.
Final runner design
https://sphotos-b.xx.fbcdn.net/hphotos-prn1/1015021_...
Progress from Sunday funday...I finalized position of the double slip fit collector and turbine flange transition. It's starting to look like a real manifold :D
https://fbcdn-sphotos-g-a.akamaih...
Some progress on the manifold...it's almost done, just waiting on a 1/2 in. thick head flange to be machined/delivered.
Final runner design
https://sphotos-b.xx.fbcdn.net/hphotos-prn1/1015021_...
Some progress on the manifold...it's almost done, just waiting on a 1/2 in. thick head flange to be machined/delivered.
Final runner design
https://sphotos-b.xx.fbcdn.net/hphotos-prn1/1015021_...
Some progress on the manifold...it's almost done, just waiting on a 1/2 in. thick head flange to be machined/delivered.
Final runner design
https://sphotos-b.xx.fbcdn.net/hphotos-prn1/1015021_...
Some progress on the manifold...it's almost done, just waiting on a 1/2 in. thick head flange to be machined/delivered.
Final runner design
https://sphotos-b.xx.fbcdn.net/hphotos-prn1/1015021_...
And here is some moar! The pics you are about to see and the pics you saw above are the in process pics for a set of G20 (p10) rear lateral links for a fellow -'er.
After final machining on the...
Thanks and it does clear the thermostat housing along with the crankcase breather port.
I made a little bit of progess on the prototype manifold
I have started to my own dies to swage the tubi...
Progress from Sunday funday...I finalized position of the double slip fit collector and turbine flange transition. It's starting to look like a real manifold :D
https://fbcdn-sphotos-g-a.akamaih...