Ok cool. Here's the lead time. Right now I finishing a j-pipe which will be done this weekend. After that is a turbo mani for another forum member. I should be able to start a small production run on these sometime in early May. I'll be switching to the one piece design at this time and will fixture the stabilizer bracket too. I owe Keo a set first, but I'll make these in batches and you'll get build 2 and 3. Sound good?
I'm gonna have to build a tube rack for the tacoma to pick up all the 20' lengths of tube lol!