I'm dropping off the proto parts at my brothers shop this week CTD FAB where he will he design the fixtures and then start fabbing the first manifold. We should see a finished part in about a month.
Originally Posted by javierb14 I'm dropping off the proto parts at my brothers shop this week CTD FAB where he will he design the fixtures and then start fabbing the first manifold. We should see a finished part in about a month.
Join Date: 2012-01-02 Location: Loganville, Georgia, United States Posts: 9 Trader Score: 0 (0%)
Originally Posted by javierb14 I'm dropping off the proto parts at my brothers shop this week CTD FAB where he will he design the fixtures and then start fabbing the first manifold. We should see a finished part in about a month.
I'm looking forward in having the first unit on my car.
Join Date: 2009-01-27 Location: Vancouver Wa Posts: 1,169 Trader Score: 2 (100%)
gotta see this
0 Likes
Be the first to like this post.
1991 NX2000 SR20DEEP PNW
"You have to wonder what kind of attention defecit disorder someone has to have to need a roller coaster at the fucking Nurburgring." Dave Coleman
Quick update, this might fit T4 framed turbos too! I stopped by the shop today and snapped a few pics with a BorgWarner S300 T4 on the mockup manifold.