Welcome to the SR20 Community Forum - The Dash.
Register
SR20 forum logo

Thread: Daily Countdown Checklist

+ Reply To Thread
Posts: 21-30 of 31
2010-05-23 02:41:38
#21
Monday - electronics upgrade - getting a Sirius upgrade for the headunit
2010-05-23 02:45:20
#22
Oil cooler installed.
Ducting done.
Car has been aligned.
Lap Timer installed.

Need to:
Change oil and filter
Brake fluid bleed and swap
Order another set of brake pads
Wash the pig.
Wrap and re-install downpipe...
2010-05-23 05:42:09
#23
Car finally came home to the new place today after being in storage,

Liuspeed Projectors installed.
h7 hid's wired up and installed.
Koyo installed
Clean up wiring under hood
Rear strut bar installed

Stuff left to do
bleed brakes
wash car (buff and wax if I have time)
cut rotors for street pads.
2010-05-23 12:56:00
#24
I still need to install my springs/struts/camber plates/FSB/rear ss brake lines/exhaust

and then i need to bleed my breaks and roll my rear fenders
2010-05-24 17:01:24
#25
Originally Posted by vqman
I still need to install my springs/struts/camber plates/FSB/rear ss brake lines/exhaust

and then i need to bleed my breaks and roll my rear fenders


And only one weekend left... get working!
2010-05-26 12:53:09
#26
Picked it up yesterday from Innovative Sounds, why I waited so long to get Sirius is beyond me, and it sounds great. Drove out to Oxford to meet up with Tony (the best body & paint guy I know) and discuss plans for Sunny. We were in agreement that there is not time to do a proper paint job before the convention, but we could do some touch up. 4 hours of sanding, tape work and a rattle can later we have these results:

Before:


After:


Before:


After:


Looks good from 20+ feet and will be fully prepped and painted for next year. I'm almost ready, need to do an oil change and radiator flush today. Off to Gran Turismo for alignment tomorrow and then we should be ready to roll. Good thing too, cause it's back to work on Friday thru Wednesday when we hit the road.

How is everyone else doing?
2010-05-26 13:10:00
#27
Downpipe wrapped and installed.
Oil and filter changed.
Mesh Panels made for fog light holes (to protect oil cooler from debris).
Strut bar fitted.

Need to button up the front and re-torque all critical suspension bolts.
Wash and wax the pig.
Brake fluid swap and rear brake inspection.
2010-05-26 13:44:08
#28
Someone buy my car and trailer so you can get her to the convention and on the track
2010-05-26 17:21:17
#29
Originally Posted by Cliff
Someone buy my car and trailer so you can get her to the convention and on the track


PM me trailer details...
2010-05-26 19:49:00
#30
7 days till departure.
+ Reply To Thread
  • [Type to search users.]
  • Quick Reply
    Thread Information
    There are currently ? users browsing this thread. (? members & ? guests)
    StubUserName

    Back to top