Not really, As long as i have everything there, I can have the motor assembled, in the car, everything else installed within 4-5 days easily. The cage and all other important fab work will be done. Im not going to be working. Im taking 2 months off for this whole ordeal before I come back overseas. I get back May 1st. This stuff doesnt take long to do when you have the time to do it and actually just do it. Ill have basicly 3 1/2 weeks to get the car done, tuned, and test out which the dyno and testing will happen the same weekend then probably another week or so to do final prep or fix anything needed. It wont be that hectic and im not at all worried about it.